UNIVERSALENGINEERING1
https://www.ueatco.com
918826555990
Mil Contro

Mil Control Valve

Description

Extended body construction: This ensures that stuffing box is as far away as possible from the fluid flow area so as to prevent freezing of the packing. Zig - Zag flow path: Minimizes body size to reduce heat in-leak thus preventing loss of energy from the fluid. Heavy guided extended tubular plug: The plug is guided heavily along the body wall close to the seating area ensuring plug stability despite the extended plug. Tubular construction again minimizes heat in-leak

Book Appointment

No services available for booking.

Select Staff

AnyBody

Morning
    Afternoon
      Evening
        Night
          Appointment Slot Unavailable
          Your enquiry
          Mobile or Email

          Appointment date & time

          Sunday, 7 Aug, 6:00 PM

          Your Name
          Mobile Number
          Email Id
          Message

          Balinese massage - 60 min

          INR 200

          INR 500

          products False False 08048053670